The Executive Engineer of Works Division-VII (NH), PWD, Panaji, and Administrator of NH-66 has announced the closure of the New Mandovi Bridge for all vehicular traffic from March 27 to April 5, 2025. Vehicles with a Gross Vehicle Weight (GVW) of up to 12 tons will be diverted to the Old Mandovi Bridge, while those exceeding 12 tons will be routed via the Atal Setu. The closure is to facilitate carpet overlaying, safety measures, and bridge painting.